Global Diving - New York DEP Saturation Diving Bell Recovery from 70 inch to feet Watch Video
Preview(s):
Gallery
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)
Description: We were contracted by Roundout Constructors to perform detailed inspection and measurements of an existing horizontal drift and submarine door, removal of existing plumbing componets, remove and replace a 24-inch gate valve encased in concrete The work was performed in an access shaft of the Delaware Aqueduct system, owned and operated by New York City's Department of Environmental Protection. The drift and valve are located in approximately 685 feet of water, at the bottom of an 13-foot diamete
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)